Engineering & Construction

DIPON Group, since its inception in 1970, maintaining its excellence repute in Engineering and Construction services in different infrastructure projects. It has successfully Completed more than 200 Projects of Engineering & Construction, Project Investment & Development and IT & ITES.

Its area of core services cover:

EPC Services

for Power Plants, Oil & Gas Pipeline, Tanks & Terminals and mega Industrial Projects

Civil Engineering Works

like Piling & Ground Engineering Works, Special Foundations and Structures involving mass concreting

20140703_145401

Mechanical & Electrical Works

involving fabrication and erection works for all kind of projects

DIPON was established as a prestigious business house for its quality work, safe practices and its commitment to the Client. It ensures using of best project management practices, construction techniques, international quality standards and safety regulations. Today, the Group is capable of executing sizeable projects on EPC basis in Oil and Gas Sector, Power Plant, Process Plant, Refinery, Tank & Terminal and Mega Industrial Works. It has bagged repeated orders from different clients due to quality of services, timely completion of projects and within budget.

DIPON’s sector-wise capabilities can be detailed as follows:

OIL & GAS

  • Pipelines
  • Tanks & Terminals
  • Gas Process Plants
  • Gas Regulating and Metering Stations
  • Offshore and Onshore Gas Field Support Facilities (i.e. all M&E, Fabrication, Piping etc.)
  • Onshore Field Developments (All Construction, dredging and Logistics Services)
  • Compressor Stations
  • Drilling Site Preparations (All Construction, Access Preparation and Logistics Services)
  • Industrial Unit Installations
  • Salvage Operations
  • Erection, Fabrication and Installation of Machinery and Plants

POWER

  • Power Plants
  • Power Plant Overhauling Works
  • Civil Works for all kind of structures
  • Mechanical Works (Fabrication & Erection of Streel Structures)
  • Special Works like Silo and Chimney
  • Substation

INFRASTRUCTURE

  • Roads / Bridges / Railways / Airports
  • Water & Sewerage Pipelines
  • Dredging & Land Development Works
  • Jetty Construction
  • Townships, Commercial and Residential Buildings
  • Pre-fabricated Buildings & Structures

Project Portfolio

Pipeline

  1. Construction of 36″OD x 1000 psig x 41.5 KM Gas Transmission Pipeline from Bibiyana Gas field to South Bank of Kalni River (Lot-l/Sec -A) of Bibiyana- Dhanua Gas Transmission Pipeline Project at Habiganj.
  2. Construction of 24 Km, 508mm (20″ OD) x 1000 psig High Pressure Natural Gas Transmission Pipeline Shimulia, Kushtia (AP no. 57) to North-East Bank of Kumar River (AP no. 116) Sripur, Shoilkupa (Section-B) under Bheramara – Khulna Gas Transmission Pipeline Project at-Kushtia & Jhenaidah
  3. Construction of 21.2 Km long 762 mm (30 inch) OD x 1000 psig High Pressure Natural Gas Transmission Pipeline from Monohordi to Bagherhat (Section -A of “Monohordi- Dhanua -Elenga-East Bank of Jamuna Bridge Gas Transmission Pipeline and Installation of Compressor Station at Ashuganj and Elenga Project”) Gazipur.
  4. Procurement and Supply of all Materials and Construction of 20 – inch 1000 psig 10 KM High Pressure Gas Transmission Pipeline from Bibiyana Gas Field End to Bibiyana Power Station-3 at Parkul, Nobiganj and Hook Up on Turnkey Basis.
  5. Gas supply under EPC contract (Engineering, Design, Drawing, Procurement & Construction) for 16″ OD PSIG pipeline including Installation of RMS at Narayangonj.

Power Plants / Tank Terminals

  1. 100 MW HFO based Power Plant Project including Construction of Tank Terminal & Railway Wagon Unloading Facilities at Jamalpur, Bangladesh for Powerpac Mutiara
  2. 100 MW HFO based Power Plant Project including Construction of Tank Terminal & Unloading Jetty Facilities at Keraniganj, Bangladesh for Powerpac Mutiara
  3. Engineering, Procurement & Construction of 17 MW Power Plant Project at Chittagong for S. Alam Power Generation Ltd.
  4. 100 MW HFO Based Power Plant Project at Chittagong for Acorn Infrastructure Services Limited.
  5. 50 MW Power Plant Project at Thakurgaon for RZ Power Ltd.

Regulating and Metering Stations

  1. Design, Build, Procurement & Supply, Installation and Construction and Testing and Commissioning of 1 (one) 600 MMSCFD Capacity Custody Transfer Metering Station (CTMS) at Maheshkhali and 01 (one) 600 MMSCFD Capacity City Gate Station (CGS) at Anowara on Turnkey Basis.
  2. Design, Build and Turnkey Supply, Installation, Construction, Testing, Commissioning of three Interface Metering Stations (Town Border Stations -TBS) at Kutumbapur, Feni and Barabkunda.
  3. 24″ 12″ & 8” DN Mechanical Installation & Construction of Regulating & Metering and Manifold Station at Ashugonj under Contract with TRE-PI-PROGETTI, SPA, Italy.

Process Plants / Compressor Station / Industrial Projects

  1. Engineering, Procurement and Installation of Stainless Steel Nut Manufacturing Plant including a Vacuum Annealing Furnace at Dhaka Exporting Processing Zone
  2. Construction of 600 MMCFD Bibiyana Gas Processing Plant, Bibiyana, Hobigonj
  3. Compressor Station Installation Services at Feni
  4. Haripur Gas Booster Compressor Station at Narayanganj
  5. Mechanical construction work for Chattak Gas Process Plant, Sylhet

Piling Works

  1. Civil Works for Pile, Pile Cap, Pedestal etc. for Main Plant area for Unit#2, BOP, Switchyard and Misc Works for 2×660 MW Maitree STPP, Rampal
  2. Providing Ready Mix Concrete for 2×660 MW Maitree Super Thermal Power Project at Moidara Village, Rampal Upzila, Bagerhat District
  3. Construction of 1,335 Numbers of Piles-800 mm dia X 25m to 38m long at Sirajganj 414 mw Power Plant of SembCorp of Singapore
  4. Construction of 751 Numbers of Cast-in-Situ piles for Bibiyana Gas Plant Expansion Project at under operation Plant in Bibiyana (Live Plant), Bangladesh
  5. 637 Numbers of Cast in situ Piles and Ground Engineering Works for Omera LPG Limited at Mongla, Bogra, Ghorasal and Chittagong
  6. Installation, testing of cast-in-situ RCC bored piles and pre-cast RCC vertical driven pile including allied works as per specification for 2×660 MW Maitree STPP, Rampal
  7. Test Pile and Piling for 400 MW Combined Cycle Power Plant Project (Sirajganj Unit – 4).
  8. Construction of 1,744 nos of cast in situ piles including load testing, PIT & Embankment Construction work for Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla

Drilling Pads/Ground Engineering

  1. Drilling Pad Construction and Facilities (Including River Jetty) at Char Kajal, Galachipa, Patuakhali, PSC Block-7 at Barisal.
  2. Drill Sites Preparation for Feni Well 6 & 7 including access road at Feni Gas Field
  3. Drilling Site Preparation at Chattak Gas Field, Sylhet for Niko.

Townships, Commercial and Residential Projects

  1. Construction of 45 Villas at Al Dhait South in Ras Al Khaimah including substation and recreational facilities
  2. Construction of School in Khalifa City, Abu Dhabi for Mr Mohammed Suwaidi
  3. Construction, completion and maintenance of Five Buildings (CRITERION PEONY, CRITERION FARHANA, CRITERION SELEENA, CRITERION ZEPHYR and CRITERION THE ADDRESS) in Dhaka
  4. Development of Township of 40 Acre in Mysore for Yashaswini Gruha Nirmana Sahakar Sanga, Mysore, India
  5. Construction, Completion & Maintenance of Commercial Building for Mr Harqous Suwaidan Al Mas Al Dhaheri in MBZ City, Abu Dhabi

Water Supply Pipeline

  1. Water Pipeline Works with associated chamber works for Section-1 in Dhaka City, From Gabtoli To Mirpur DOHS under DWASA
  2. Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla
  3. Water Pipeline Works, Pipe Jacking, River Crossing through Cofferdam Work for Section 4-b under Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla

Bridges /Jetties

  1. Construction of Jetty for Chattak Gas Field at Dwarabazar, Chattak at Sylhet.
  2. Construction of 4 nos. Bridges (30m, 31m, 50m & 80m) at Chattak, Sylhet

Fabrication & Erection Works

  1. Construction of 600 MMCFD Bibiyana Gas Processing Plant, Bibiyana, Hobigonj
  2. Mechanical construction work for Chattak Gas Process Plant, Sylhet
  3. Fabrication & Installation of Process Plant at Bhangura, Comilla
  4. Mechanical, Steel Structure & Civil works of BYGP, South -South Pad, West Pad, North Pad, Muchai Compressor Station Project.
  5. Haripur Gas Booster Compressor Station at Narayanganj
  6. Salvage Operation for two (2) numbers of Blowout at Tangratilla under Chattak Gas Field, Sylhet
  7. Construction of 100 MW HFO Based Acorn Power Plant Project at Chittagong.
  8. Civil, Mechanical and Electrical Works of 30 MW Power Plant at Chattak, Sylhet
  9. 50 MW Power Plant Project at CEPZ, Chittagong for Malancha Holdings Limited, Bangladesh
  10. 40 MW Power Plant Project at DEPZ for Malancha Holdings Limited, Bangladesh
  11. 6.6 MW Power Plant Project at Gazipur
  12. Supply Structural Steel and Fabrication of Steelwork Package for the Phase 3 Upgrade Works at Bangora, Bangladesh, ITT No. BD 13-S.1943-PR
  13. Compressor Station Installation Services at Feni
  14. Fabrication, Erection, Installation of 3 x 860 KW GUASCOR Gas Generator for Energypac Power Generation Ltd.

Gallery

Pipeline

Power Plants / Tank Terminals

Regulating and Metering Stations

Process Plants / Compressor Station / Industrial Projects

Piling Works

Drilling Pads/Ground Engineering

Townships, Commercial and Residential Projects

Water Supply Pipeline

Bridges /Jetties

Fabrication & Erection Works